Sequence of construction of the house and arrangement of the rural estate

This article finishes a subject: how to equip a country farmstead with the story about in what sequence it is necessary to conduct construction of the house and to equip the rural estate

We finish a subject: how to equip a country farmstead

We finish a subject: how to equip a country farmstead

Having addressed to the adviser-organizer of UKTs in your area, you can receive exhaustive information on where you should address and how to issue necessary acts, documents which will allow you to begin construction – own house.

Documents on allocation under construction of the land lot are received. With what to begin? After planning and plowing of the designated site in nature to fence (the area under a household is best of all a grid). And on perimeter of a site to plant a bush which will be in the future a green fencing. To put a shed for tool and cement storage.

To deliver a butovy stone under the base and cement. To bring the electric power – external electroconducting with installation of necessary support.

Marking under the base to do after the chosen standard project recommended in regional management of architecture. To track coincidence of diagonals at ground works under the main base. To define parts of the world and a wind rose.

Proyektanta offer rather wide choice of standard housing constructions. It is possible to stop on 2 – 3-storeyed option with a front and domestic entrance, with garage and utility rooms in semibasement level of the 1st floor – garage, a boiler room, a bath bathroom. Kitchen plan in a zero floor. After obtaining documentation it is possible to fence a site, to plant fruit-trees, bushes and to fill in the base.

To keep within in time of all these works it is possible for 1 year. Consider that you already completely entered into construction process.

Second stage. Preparation of a stone, sand, overlapping plates, purchase of rafters and slate – without delivery of these materials in full to continue construction it is impossible.

Stone – to buy and deliver. Shell rock or blocks. It is possible to go to business trip on Besharansky, Saksky, Evpatoriysky, Belogorsky pits, to be issued temporarily for work in career which is closer from your village. There general workers loaders and if you the mechanic or the electrician, and these specialties come in handy are always necessary. Payment price-work under the contract in which it is possible to include and a payment a stone, that is the goods which lets out this pit.

At a conscientious attitude to work it is possible in a year with surcharge to prepare and take out a stone and construction blocks on the site.

On cement, sand, plates of overlapping, a rafter and slate, and also on transportation costs and a payment for the executed construction works are necessary only money, and considerable.

Here also it will be necessary to issue the credit which by second year can be issued in the next regional bank.

Third stage: laying of walls, plates of overlappings, installation of overlappings, roofs. By good preliminary preparation, delivery of these materials it is possible to execute these works in one month and in winter to order windows and doors, and also to prepare one room with temporary heating in winter. The house already costs, and it should be rendered habitable. And in the winter it will be possible to live in this room. It both protection, and current works. To deliver tes boards on floors, to combine everything in the house for drying, to store other materials.                                                                                

To conduct electroconducting, to acquire the panel board equipment, to register the external electric meter.                                                             

If there is a possibility - to get the wind electrounit, and at slate installation on a roof to provide in the future a place for a solar power plant. Proceeding from planning of rooms step by step to order and make project documentation on electroconducting, water supply, a heat supply and the sewerage. All these installation works are carried out strictly according to design drawings prior to the beginning of plaster works.

Fourth stage. Channels under a fireplace, the stove, a boiler room, a bathroom and garage channels with the bottom lattices of ventilation. These works will need necessary quantity of a brick.

Sand delivery. Lime preparation. It is possible to make and burn out in winter conditions on a site – coal and a limy stone is necessary. In foothill regions of this stone it is more than enough, it is possible to collect. Internal plaster without a mechanical  concrete mixer less qualitative will hire or buy the Concrete mixer, it will be necessary to you not less than three years.

Fifth stage. Otdelochnyerabota of own housing construction. After plaster works indoors, and its external plaster, it is possible to pass to finishing works and front registration of the house, to adjustment of doors, window frames, installation of locks of latches, etc., their painting.

It is necessary to turn special attention to a color color of coloring considering a provisional cover of all wooden designs olifovy soil which should keep a tree from cracks.

Olifovy processing, is desirable (that is the first coat), should be stood and well dry out. Then it is possible to carry out a coupler of sexual boards and their careful adjustment.

Before starting painting, study quality of paints, their color scale. On banks you will find the description of their application.

It is impossible to confuse nitropaints with oil, on the basis of drying oil. The best option, to painting to invite the expert well familiar with painting works. Most to get and study literature on finishing works. How in the future you should conduct small repair work on the care of the favourite dwelling.

The gas economy will carry out only on project documentation the certified gas service and the expert of a gas economy. Installation of electric equipment, electrodevices to entrust the expert – to the electrician. Caring of full safety of foodstuff especially to think over refrigerator or cellar installation.

FROM "DOMESTIC TYRANNY" -  BOOKS XVIV.

And in cellars both in glaciers, and in pogrebyoets xleby and kalatches, cheeses and eggs, zobela and onions, garlic and meat everyone sveyozhy, both corned beef, and fish fresh and proyosolenny, both medical fresh, and viands boiled, both meat, and fish, and any stock food, both cucumbers, and cabbage – salty and fresh – both turnip, and any vegetables, both saffron milk caps, and caviar, brines stovlenny, and berry juices; cherry in treacle and crimson; both apples and pears, and. melons, and water-melons in treacle, both plums, and lemons, both levashnik, and waters brusnichyony and home brew – and about that any stock to a klyuchnik the nobility; and how many that in po­grebe is put, and in a glacier; all would be found peremecheno: that quite also that not quite; also it is tried on, both zapisayono and how many where that that is given on pri­kazu monarchic, and how many razoj­detsya; that would be all in the account, would be that the report to all in everything to give, and all that was pure, and is covered, and not zatxlosya, both didn’t grow mouldy, and didn’t turn sour; and wine strong, any best drink, in an oprichyony cellar behind the lock to keep; and itself one there would go.

When you were fully satisfied from the executed works, and the light, beautiful house will begin to shine purity, a sunlight, pleasure of bright cheerful paints, then can start measurement of places just for decoration. Now it is necessary to think how to acquire convenient modern furniture. To sustain an interior, freedom and the simplicity, each living room on its appointment

Prepared N PUGACHEV, the adviser-organizer of the Kirov UKO.